This facility was designed and constructed to be flexible and accommodate a variety of tenants and uses.
This facility was designed and constructed to be flexible and accommodate a variety of tenants and uses.
This facility designed and constructed for Walmart’s eCommerce fullfillment center needs for the Southeastern US.
This facility designed and constructed for Procter & Gamble’s distribution needs for the Eastern US.
This build-out facility designed and constructed in Building 5 for Bed Bath & Beyond’s national E-Commerce distribution needs.
Building 1B was speculative 538,640 sf warehouse distribution facility built on the expansion area for the lot 1 building.
Build-to-suit project for Walmart eCommerce. 1,194,800 SF single story structure, designed by Commerce ,”Super Flat” floors. Equipped to move over 300,000 sku’s per day in full operation.
A 800,280 sf single story warehouse distribution center built by Commerce Construction. The project was a build-to-suit for our first Tenant Crayola (Binney and Smith).
1.2 MSF build-to-suit, 40′ clear space, MFL wall, 300,000 gallon fire water tank for redundant water supply, aerosol storage room, and special foundations for auto-sort/auto-retrieval system.
TI included approximately 32,000 sf cooler/freezer with glycol floor warming system, roof structure upgrades to accommodate freezer/cooler equipment and insulated ceiling panels.
Major relocation project for Tenant Nevada Power Company. Included 105,000 SF concrete and steel mezzanine located inside 288,000 SF Shell Building.